How it works
A preliminary engineering review of your Ontario renovation against the Building Code — five steps from project description to a permit-ready pathway.
- 1
Describe your project
Tell us about the renovation, addition, basement apartment, ADU or structural change you're planning.
- 2
Confirm property details
Address, municipality, dwelling type and condition — used to apply Ontario Building Code and local zoning context.
- 3
Upload photos or sketches
Optional photos, floor plans or sketches to inform the preliminary engineering review.
- 4
Review your permit pathway
A clear summary of likely permit requirements, engineering reviews and expected timeline.
- 5
Connect with a professional
Optionally engage a licensed engineer for permit drawings and submission support.